Live Oak High School Modernization

The majority of the new construction was completed in the summer so students could occupy the 13 classrooms, restrooms and other facilities at the start of the school year. Continue reading

Del Dayo & Mariemont Elementary Schools

Landmark installed two new Project Frog classroom buildings at Del Dayo ES, a growing campus in Sacramento, California. Assisting the District with this project from schematic design, we applied lessons learned from our previous successful Project Frog projects, including critical schedule information. These projects were the District’s first encounter with this panelized system, which was selected due to the speed of assembly. Continue reading

Natomas Charter Star Academy

Brand new K – 5 elementary school consisting of five buildings including an Administration Building, Multi-purpose building, and three classroom buildings. Continue reading

The Bayshore School

Demolition of the existing campus, construction of an interim campus, and construction of fabulous, state-of-the-art $30M new TK – 8 campus, in the heart of Daly City. The beautiful new 50,836 square foot, two-story school is built on a 2.12-acre site, and includes indoor/outdoor performance spaces, second story outdoor learning areas attached to 21st Century classrooms with flexible teaching spaces, STEAM spaces, maker labs, all with dramatic architecture and green construction throughout. Continue reading